Exhale
Exhale - 2026-03-09 - 8 Enderley Avenue, Surfers Paradise
Exhale is a boutique, resident-only beachside building of 54, three-bedroom residences in the exclusive Northcliffe pocket, 60 metres to the sand. Between Surfers Paradise and Broadbeach, close to both, removed from the noise.
Acquired, designed, developed, built, sold, and managed by SIERA. One team, no handoffs.

54 resident-only homes, 60 metres to the sand, designed for how you live every day.
Experience the best of both worlds at Exhale, where the calm of the coast meets the connection of the city. Discover why Northcliffe is one of the Gold Coast’s most coveted addresses by exploring our neighbourhood map and uncovering some of the local favourites that make life here so effortless.
Construction Updates
Exhale is on its way. Here you’ll find the latest construction progress, key milestones, and behind‑the‑scenes moments as we bring Exhale to life.


Project Details
• 54 residents only residences across 26 levels
• 60 metres to the sand in the exclusive Northcliffe pocket
• Three-bedroom residences, all with multi-purpose rooms
• Two levels of residents only amenity on Levels 2 and 3
• Dual street access via Enderley Avenue and Vista Street
• Pedestrian crossing direct to patrolled beaches
• Northcliffe light rail station at the end of the avenue
• Contrast therapy ritual, heated magnesium pool, yoga and pilates studio
• Mineral stone benchtops and considered finishes throughout
• Designed with BDA Architecture and Studio Collective
• Demolition March 2026. Piling: April 2026. Completion: Late 2028
• 60 metres to the sand in the exclusive Northcliffe pocket
• Three-bedroom residences, all with multi-purpose rooms
• Two levels of residents only amenity on Levels 2 and 3
• Dual street access via Enderley Avenue and Vista Street
• Pedestrian crossing direct to patrolled beaches
• Northcliffe light rail station at the end of the avenue
• Contrast therapy ritual, heated magnesium pool, yoga and pilates studio
• Mineral stone benchtops and considered finishes throughout
• Designed with BDA Architecture and Studio Collective
• Demolition March 2026. Piling: April 2026. Completion: Late 2028
1/13



A location that invites you to breathe, relax and connect.

